2010

  • 2 mobile harbour cranes of 100 ton capacity were purchased in 2010. The cranes can be used for container, general cargo and dry bulk cargo handling operations by changing the attachments.
  • 8 state of the art RTG’s were purchased in 2010.
  • 41 forklifts of different lifting capacities were purchased for container stuffing and unstuffing operations in the CFS station.
  • 6 Loaders with 3 ton capacity were purchased for stuffing and unstuffing of dry bulk cargoes in containers.
  • The speed of container stuffing and unstuffing operations have been increased through the purchase of 9 new conveyor belts.
  • 9 lowbed trailers with a lifting capacity of 120 tons have been purchased for the transportation of project cargoes.
  • New Customs Building was constructed.
  • An area of 67,450 m2 was restructured.
  • MIP ranked 97th in the biggest 120 Container Ports In The World list by Container Management Magazine.