  • T.C.D.D. Mersin Port Management was taken over for 36 years period on the date of 11 May 2007.
  • The Container Berth road was asphalted.
  • 6 new 30m lighting poles with elevator motors and each with 10 units 1000 watt lighting have been installed in the Port area.
  • Power lines of the entire port were put underground.
  • 15 Forklifts were put into service.
  • 8 Reach Stackers were put into service.
  • 3 MHC's (Mobile Harbour Crane) were put into service.
  • Handheld and Vehicle terminals application was launched in some pilot areas for the follow up of container movements.
  • MIP was included in the list of Top 120 Container Terminals in The World Ranking for the first time, ranked 114th.